IMPLEMENTATION FOR DUSLO DRINKING WATER PLANT
MODERNISING THE EFFICIENCY OF THE WATERWORKS OPERATION
On the project, we worked with our long-time partner, Farkas-VM, with whom we regularly carry out demanding and technically complex contracts. This time we focused on the modernization and increase of efficiency of the water plant, which is a key element of the new facility of Duslo, a.s. in Šala.
LIGHTNING CONDUCTOR, LIGHTING AND POWER DISTRIBUTION
Our company was involved in this project in the implementation of comprehensive and professional services in the field of electrical installations. The priority was to ensure high quality work, reliability and precise technical solutions for the specific needs of the client.
We installed a lightning conductor, earthing and protective bonding to ensure that the building is protected from external influences as much as possible. This ensured the safety not only of the building itself, but also of its technology.
We have implemented lighting and internal power distribution systems, which ensure comfortable and efficient use of electricity in the interior.
ENERGY-EFFICIENT AND MODERN SYSTEMS
We have supplied quality components for electric heating and cooling that meet the requirements for modern and energy-efficient systems. We have implemented power supply and operational power distribution systems that are essential for safe and reliable operation of the technologies.
CONTROL CABINET AND SWITCHBOARDS
As part of the production part of the project, we manufactured and installed a control cabinet for the pumps, a switchboard for lighting and socket circuits, as well as a technological switchboard. These switchboards meet the highest standards of quality, functionality and safety, which contributed to the smooth and efficient operation of the entire water plant system.
This project is a testament to our expertise, years of experience and responsible approach that our clients have relied on for over 30 years. We are proud to have been able to contribute to the modernization that enhances the efficiency and reliability of the new drinking water plant at Duslo, Inc.